SWEETWATER LANE
PROJECT HIGHLIGHTS
CLIENT
HARRIS COUNTY ENGINEERING DEPARTMENT, HCED
CONSTRUCTION COST
$25 MILLION
LOCATION
HARRIS COUNTY, TEXAS
Agha Engineering, LLC is PRIME on the $25M roadway reconstruction of Sweetwater Lane from West Canino Road to West Road in Harris County. The proposed project includes reconstructing the existing lanes with roadside ditches to add wider lanes, consisting of 6-ft sidewalks, curb, gutter, and a closed storm sewer system within the existing right of way.
Project limits crossed floodway areas of Greens Bayou and Halls Bayou. Project directly crossed the Halls Bayou (FEMA Studied) channel with an existing five-span bridge.