BOUDREAUX DETENTION BASIN
PROJECT HIGHLIGHTS
CLIENT
HARRIS COUNTY FLOOD CONTROL DISTRICT, HCFCD
CONSTRUCTION COST
$65 MILLION
LOCATION
HARRIS COUNTY, TEXAS
Agha Engineering, LLC is PRIME on the $65M SWDB project and is currently performing a preliminary engineering report for the proposed 300-acre floodplain preservation basin in the Willow Creek Watershed. The proposed basin is one of the two 2018 bond projects recommended in the previous Willow Creek Watershed master study with a construction cost of $65 million. The 300-acre site includes the removal of a small non-jurisdictional tributary channel that currently splits the 300-acre site and will require a channel stabilization design.